Municipal Building
Construction


Construction Progress

Municipal Complex, Senior Citizens Center & Public Library

Hasbrouck Heights Free Public Library
Free Public Library [Dedication] [Mayor's Remarks] December 14, 2003
[Photos of the Library's big move] November 17-18, 2003

New Municipal Complex Dedication  October 18, 2003
[Boro Hall Ribbon Cutting]    [Senior Center & Prayers]    [Remarks by Mayor Torre]
[Photos] Employees "Raising the Flag" at New Boro Hall on September 12, 2003
[1st Mayor & Council Meeting] in the new chambers, September 9, 2003
The Big Move -- September 5, 2003.  Take a tour of the New Municipal Complex
[Moving into Municipal Offices][Library & Senior Center][Library Big Room][Basement]

Mason's Cornerstone Ceremony, March 2, 2003 [Story & Program] [Ceremony]
Municipal Complex Ground Breaking Ceremony, October 13, 2001 [Photos]

Webcam          The Big Fire [Index]      Library & Senior Center [Background] info


Photos of Construction Progress

Late April 2003 -- to come
Late March 2003 -- to come
Early March 2003 -- to come
Late January 2003 -- to come
Mid-December -- to come
October 2003 -- to come
Late September Council Tours Site  -- [First & Second Floor] [Basement & General Site]
Late August -- [2nd floor & start insulation][1st floor & basement][Start roof][General site]
Early July 2002 -- Pouring concrete floors  [Second floor] [First floor]
Late May/Early June  -- Working the Steel [#1] [#2] [#3]  Working Steel Progression
Mid-May -- Finishing foundation work.
Late April 2002 -- Pouring foundation walls for back of building
Early April 2002 -- Pouring foundation walls for front of building
Late March 2002 -- Completing excavation & starting foundation.
February/March 2002 -- Beginning excavation.

Site Preparation
Boulevard Shell Demolition April 16, 2003 [Group 1][Group 2]
Old Bank Building demolished [Photos]      Apartment Building demolished [Photos]
Houses demolished September 17 & 18, 2001 [Photos 1][Photos 2]
Houses demolished January 10, 2001 [Photos 1][Photos 2]
Begining the process [Photos]

Working plans 90% complete --  prior to excavation
Floor Plans: [Basement] [First Level - Municipal Offices & Senior Center]
[Second Level - Library] [Park Area at Boulevard & Madison]
Elevation: [Front - Boulevard] [Back] [Madison Ave.] [Central Ave.][Treatment Enlargement]
Architect's Drawing & model as posted at Boro Hall, March 2002





Back to top of page


bhdwga29a.jpg (10285 bytes)
Architect's Drawing & model as posted at Boro Hall March 2002

Working Plans

Working plans 90% complete, prior to excavation and foundation.

Floor Plans: [Basement] [First Level - Municipal Offices & Senior Center]
[Second Level - Library] [Park Area at Boulevard & Madison]
Elevation: [Front - Boulevard] [Back] [Madison Ave.] [Central Ave.][Treatment Enlargement]


Architect: Arcari & Iovino Architects, PC
Civil Engineer: Job & Job Consulting Engineers
Structural Engineer: Severud Associates
Mechanical, Electrical, Plumbing Engineers: Altieri Sebor Wieber Consulting Engineers
Project Manager: Beragan Construction Company


Back to top of page


Plans
Plans presented to Zoning/Planning Board March 13, 2001

1.jpg (53444 bytes)

Municipal Complex Plan B Summary: Library on top floor. Senior Center, Municipal Offices on first floor. 100+ off street parking spaces. Police Department,  HH Fire Department & Municipal Court to remain at 248 Hamilton. Costs expected to be about $10 million dollars; about half covered with insurance, grants, etc.


4a.jpg (30716 bytes)
The combined Zoning/Planning Boards on March 13, 2001 [Click for larger image]


Back to top of page


Site Preparation

Municipal Complex Ground Breaking Ceremony
was held 2 p.m. Saturday, October 13, 2001
With shovels in hand, the Mayor & Council, Library and Seniors formally broke ground on the New Municipal Complex. [Photos]
c21a.jpg (11754 bytes)



c49a.jpg (7987 bytes)
Houses demolished September 17 & 18, 2001 [Photos 1][Photos 2]

Houses demolished January 10, 2001 [Photos 1][Photos 2]

Begining the process [Photos]

Special equipment purchased in 2000 to maintain the boro sewer system was put to work January 24, 2001 at the conrner of The Boulevard and Madison Avenue, to insure that the system was ready for upcoming construction of the new Municipal Complex. [Photos]


Back to top of page



News Clips


Editor note: At this time, we do not have permission to present the stories and photos that were published in the Record, Herald News or Shopper News -- within this web-site.

Heights apartment tenants losing battle
[The Record, Thursday, March 29, 2001]


Municipal complex seen ushering Heights rebirth
[The Record, Saturday, March 24, 2001]

Back to top of page


Background Information
dwg1aa.jpg (21958 bytes)
[Click here]
for larger copy of original proposed drawings
The Big Fire [Index]
Transition [Background]
New Library & Senior Center [Background]
General [Boulevard Index]       
Burgis Boulevard Redevelopment Report in [pdf


Back to top of page



Recent Construction of School Additions


Please patronize our sponsors. Ads with links are clickable.

bar_eleg.gif (11170 bytes)

School Additions & Renovations -- Progressive construction photos
After a $10.4 million referendum was passed  in May 1998 by the community, the Board of Education began work on the new additions to Euclid, Linclon and the Jr./Sr. High School on July 1999.  Work was nearly completed September 8, 2000, in time for September 11th school opening.  Here is a photo essay of the project as it unfolded.
Jr/Sr High School Construction Photos
[Photo Gallery #1] -- August  thru Early October
[Photo Gallery #2] -- Late October thru Mid-Nov.
[Photo Gallery #3] -- December 1999
[Photo Gallery #4] -- Early January 2000

[Photo Gallery #5] -- Mid-February 2000
[Photo Gallery #6] -- Late-March 2000
[Photo Gallery #7] -- Late April 2000
[Photo Gallery #8] -- Late May 2000
[Photo Gallery #9] -- Late June 2000
[Photo Gallery #10] -- Late July 2000
[Photo Gallery #11] -- Late August 2000
[Photo Gallery #12] -- September 8, 2000
[Dedication] -- October 15, 2000
[Mason's Cornerstone Ceremony] -- October 22, 2000

Ground Breaking For New Additions

to Lincoln School, Euclid School, and 

Jr./Sr. High School, Thursday, July 22 at 7:00 p.m.
[Program]   [Speaker Photo's]   [Group Photo's]

3 La Salle Ave. Houses Being Demolished
For Expansion
#1 August 23, 1999 [Photos 1]    [Photos 2]

#2 October 14, 2000 [Photos]
#3 October 23, 2000 [Photos]
Euclid School Construction Photos
[Photo Gallery #1] -- August  thru Dec. 1999
[Photo Gallery #2] -- Early January 2000

[Photo Gallery #3] -- Mid-Feburary 2000
[Photo Gallery #4] -- Late-March 2000
[Photo Gallery #5] -- Late April 2000
[Photo Gallery #6] -- Late May 2000
[Photo Gallery #7] -- Late June 2000
[Photo Gallery #8] -- Late July 2000
[Photo Gallery #9] -- Late August 2000
[Photo Gallery #10] -- September 8, 2000
[Ribbon Cutting] -- September 27, 2000

Lincoln School Construction Photos
[Photo Gallery #1] -- August  thru November
[Photo Gallery #2] -- December 1999
[Photo Gallery #3] -- Early January 2000

[Photo Gallery #4] -- Mid-February 2000
[Photo Gallery #5] -- Late-March 2000
[Photo Gallery #6] -- Late April 2000
[Photo Gallery #7] -- Late May 2000
[Photo Gallery #8] -- Late June 2000
[Photo Gallery #9] -- Late July 2000
[Photo Gallery #10] -- Late August 2000
[Photo Gallery #11] -- September 8, 2000
[Ribbon Cutting] -- September 26, 2000

Editor's Note: In addition to the construction photos, a complete copy of this web-site (as of October 22, 2000), was included in each of the time capsules placed in the Euclid, Lincoln and Jr/Sr High Schools.

Back to top of page

BAR_ELEG.GIF (11170 bytes)




Please patronize our sponsors. Ads with links are clickable.

BAR_ELEG.GIF (11170 bytes)

news, information and features  LOGO.GIF (7473 bytes) tm

Home Page   ·   Site Map   ·   teterboro-online.com
The Gazette Newspaper   ·   The-Boulevard-Mall

Thank you for visiting our hometown.  Come back soon!
[Contact Webmaster] [Policy Statement] [Advertising information]   Copyright 1998-2008. All rights reserved.
All photographs used in this web-site are copyrighted and property of the photographer.
Photographs used herein are on loan and are not public domain 

BAR_ELEG.GIF (11170 bytes)


Please patronize our sponsors. Ads with links are clickable.