Photos by Fritz Rethage

Third interim home
construction finish.

More 3d interim home photos [Construction start][Construction details & moving in]


The two sections of material across the back were drawn closed like a huge curtain,
fastened together and then laced to vertical supports.
b23.jpg (17699 bytes)

b25.jpg (27604 bytes)



Supports for the front were measured and prepped
while an inner ceiling skin was installed, covering the support fabrication.
b09.jpg (7954 bytes)

b27.jpg (29756 bytes)

b12.jpg (20243 bytes)

b29.jpg (27113 bytes)


b34.jpg (11238 bytes)  b30.jpg (21838 bytes)



b36.jpg (16859 bytes)


The front was pulled closed.  Cut-outs for the doors were made.
The material was attached to the front supports.
b38.jpg (24165 bytes)  b39.jpg (24139 bytes)

b41.jpg (19519 bytes)  b42.jpg (23440 bytes)

b43.jpg (19331 bytes)

b44.jpg (23383 bytes)

b47.jpg (17019 bytes)

b48.jpg (18010 bytes)

More 3d interim home photos [Construction start][Construction details & moving in]

2d Temporary Home [Groundwork][Construction #1][Construction Details][Operational]

Thank you for visiting our hometown.  Come back soon!
[The Gazette Newspaper] [Contact Webmaster] [Policy Statement] [Advertising information]  
©Copyright 1998-2008. All rights reserved.
All photographs used in this web-site are copyrighted and property of the photographer.
Photographs used herein are on loan and are not public domain 
Site created and maintained by
The Iron Horse Advertising & Marketing Co. Inc.
in collaboration with SAK Information Systems, LLC

The Gazette Newspaper Movies Stuff